Register to join the City of Trenton, Greater Trenton, Inc. and design consultant NV5 to learn more about the upcoming D&R Greenway Connector project in Trenton. This project will create a continuous bicycling connection between South Trenton and downtown by linking existing and new bicycle lanes. The project will also feature Trenton’s first protected intersection for bicyclists and a shared-use path connection to the Lower Trenton Bridge (aka, the Trenton Makes bridge). This project will link to the recently presented Cooper Field Connector project to eventually make a continuous connection between the D&R Canal Path in downtown with the D&R Canal Path that leads to Hamilton Township and Bordentown.